Transform your idea!

Standards & Accreditations

Quality Control
  • Transformed use internal systems to maintain manufacturing standards.
  • Workflow is controlled by a production planning process, should Q&A be requested or is a specific customer requirement the Q&A process will be carried out and a 3 copy production checklist will be issued with the work and completed by the operational team, this form has three Q&A check levels, so it highlights to the operator the necessary level of Q&A and provides a format upon which all the records can be made, retained or provided to the client if necessary.
  • Transformed will always test measure and conduct visual checks against retained signed record samples before commencing a production work order.
  • During the production run the first commercial part will be fully checked, recorded and machine parameters recorded.
  • The last production part is also checked, and the results recorded along with a record of the last machinery settings so this can be utilised to update the SOP process.
    As requested, checks will be conducted during a production cycle to ensure quality standards are maintained.
About Standard Pg Img

Production Part Approval Process (PPAP)

Is used in the automotive supply chain for establishing confidence in suppliers and their production processes. Actual measurements are taken from the parts produced and are used to complete the various test sheets of PPAP this is a process that Transformed Plastix have been audited against to seek customer supplier approvals.

Cta Bg Small 1
Established In 1999
Manufacturing High Quality & Cost-Effective Plastic Products for a Range of Industries
Get A Quote arrow
Our Clients
Request A Quote

Use the form below to drop us an email if you have any question or comments.